Lane Cove, NSW - Polywall ICF project

Retaining Walls - Basement

Madewell Construction pty Ltd

Polywall 270 (150mm Concrete Core) Combine with Polywall 320 (200mm Concrete Core)

Unloading the product

It was simple to unload the ICF from the Truck. Although the Truck was 8.5 meters long, 2.4-meter wide and 2.7meter height and fully packed, we shifted the polystyrene pallets and the brackets bundles quite quickly and efficiently—lightweight unloading.
This specific site has difficult truck access, so we had to carry the product about 50 meters up to the site, and as you can see, one person can take an entire ~1.62m3 cube. Save a lot of time—unloading and going straight to the wall installation.

Polywall ICF
Polywall ICF
Truck with ICF
Polywall ICF
polywall ICF
polywall ICF

starters Bars and site Preparation

Walls Installation

polywall ICF
Polywall ICF
polywall ICF
polywall ICF
polywall ICF
polywall ICF
polywall ICF
polywall ICF
polywall ICF
polywall ICF
polywall ICF
polywall ICF
polywall ICF

Ready to pour Concrete

polywall ICF
polywall ICF
polywall ICF
polywall ICF

Basement walls installation continues Part 3 until Slab / concrete floor preparation.

FIRST FLOOR

Polywall ICF walls installation up to concrete pouring preparation

Ground level;  poured ceiling (First floor slab), services inside the polystyrene panels.  Polywall ICF Panels and brackets Storage for the level above.

Housekonsept ICF
ground level ICF Housekonsept
Housekonsept ICF
Housekonsept ICF
Housekonsept - wall TV

Electricity/network services ready in the foam.  

ICF preparation Housekonsept
Housekonsept ICF
Housekonsept ICF
Housekonsept Polywall ICF
Housekonsept Polywall ICF
Housekonsept Polywall ICF
Housekonsept Polywall ICF
Housekonsept Polywall ICF
Housekonsept Polywall ICF
Housekonsept Polywall ICF Braces
Housekonsept Polywall ICF plywood
Housekonsept Polywall ICF
Housekonsept Polywall ICF

Right photo – Standing ICF wall .    Middle photo – Same ICF wall poured.    Left phone – ICF Walls with the plywood before concrete pouring. (Above the left we can see the same wall before pouring)

Unloading - more ICF Product To The project Site

Housekonsept ICF unloading Polywall ICF
Housekonsept ICF unloading Polywall ICF
Housekonsept ICF unloading Polywall ICF
Housekonsept ICF unloading Polywall ICF

First level - Back of the house completed.

Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project

2nd Floor

Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project

Finishes, Openings and external

Double glazing windows, Tripple glazing ceiling windows, Insulated membrane on the external ICF –  second insulation layer below the timber cladding, Foam Ceiling, external render, some internal brick walls, Appliances preparations

Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project
Lane Cove Polywall ICF project

Madewell Construction on instagram

Green roof at Lane Cove ICF Home
Green Roof Installation