It was simple to unload the ICF from the Truck. Although the Truck was 8.5 meters long, 2.4-meter wide and 2.7meter height and fully packed, we shifted the polystyrene pallets and the brackets bundles quite quickly and efficiently—lightweight unloading. This specific site has difficult truck access, so we had to carry the product about 50 meters up to the site, and as you can see, one person can take an entire ~1.62m3 cube. Save a lot of time—unloading and going straight to the wall installation.
starters Bars and site Preparation
Walls Installation
Ready to pour Concrete
Basement walls installation continues Part 3 until Slab / concrete floor preparation.
FIRST FLOOR
Polywall ICF walls installation up to concrete pouring preparation
Ground level; poured ceiling (First floor slab), services inside the polystyrene panels. Polywall ICF Panels and brackets Storage for the level above.
Electricity/network services ready in the foam.
Right photo – Standing ICF wall . Middle photo – Same ICF wall poured. Left phone – ICF Walls with the plywood before concrete pouring. (Above the left we can see the same wall before pouring)
Unloading - more ICF Product To The project Site
First level - Back of the house completed.
2nd Floor
Finishes, Openings and external
Double glazing windows, Tripple glazing ceiling windows, Insulated membrane on the external ICF – second insulation layer below the timber cladding, Foam Ceiling, external render, some internal brick walls, Appliances preparations